{{cartCount}} ShoppingCart Telephone

+86-755-83225825

Email

info@orwintech.com

Skype

orwintech@outlook.com

Wechat
Orwintech Wechat
WhatsApp
Orwintech WhatsApp
Message Top
Product Catalog

BYV42EB-200,118

BYV42EB-200,118

BYV42EB-200,118

lmages are for reference only.
  • Part Number

    BYV42EB-200,118

  • Manufacturer

    WeEn Semiconductors
  • Description

    DIODE ARRAY GP 200V 30A D2PAK

  • Datasheet

    DatasheetDatasheet
  • Package

    TO-263-3, D2PAK (2 Leads + Tab), TO-263AB

  • In Stock

    88,812 piece(s)

  • Unit Price

    Please Contact Us

  • Lead Time

    Can Ship Immediately

Request for Quotation

  • Payment Methods

  • Delivery Services

Diode Array 1 Pair Common Cathode 200 V 30A Surface Mount TO-263-3, D2PAK (2 Leads + Tab), TO-263AB

Quick Inquiry

BYV42EB-200,118

Get the Price Now!

Specifications

Category Discrete Semiconductor Products - Diodes - Rectifiers
Manufacturer WeEn Semiconductors
Series -
Packaging Tape & Reel (TR)-->Cut Tape (CT)
RoHS Status ROHS3 Compliant
Diode Configuration 1 Pair Common Cathode
Technology Standard
Voltage - DC Reverse (Vr) (Max) 200 V
Current - Average Rectified (Io) (per Diode) 30A
Voltage - Forward (Vf) (Max) @ If 1.2 V @ 30 A
Speed Fast Recovery =< 500ns, > 200mA (Io)
Current - Reverse Leakage @ Vr 100 µA @ 200 V
Operating Temperature - Junction 150°C (Max)
Mounting Type Surface Mount
Package / Case TO-263-3, D2PAK (2 Leads + Tab), TO-263AB
Supplier Device Package D2PAK
Base Product Number BYV42
Reverse Recovery Time (trr) 28 ns
Grade -
Qualification -

Parts with Similar Specifications

Product Attribute BYV42E-150,127 BYV42E-200,127 BYV42G-200,127 BAT30CFILM
Part Number BYV42E-150,127 BYV42E-200,127 BYV42G-200,127 BAT30CFILM
Manufacturer WeEn Semiconductors WeEn Semiconductors WeEn Semiconductors STMicroelectronics
RoHS Status ROHS3 Compliant ROHS3 Compliant RoHS Compliant ROHS3 Compliant
Description DIODE ARRAY GP 150V 30A TO-220AB DIODE ARRAY GP 200V 30A TO-220AB DIODE ARRAY GP 200V 15A TO262 DIODE ARR SCHOT 30V 300MA SOT233
Series - - - -
Packaging Tube Tube Tube Tape & Reel (TR)-->Cut Tape (CT)

Shipment

Delivery Time In-stock items can be shipped within 24 hours. Some parts will be arranged for delivery within 1-2 days from the date all items arrive at our warehouse. And Orwintech ships order once a day at about 17:00, except Sunday. Once the goods are shipped, the estimated delivery time depends on the shipping methods and Delivery destination. The table below shows are the logistic time for some common countries.
Delivery Cost Use your express account for shipment if you have one. Use our account for the shipment. Refer to the table below for the approximate charges. (Different time frame / countries / package size has different price.)
Delivery Method Global Common Shipment by DHL / UPS / FedEx / TNT / EMS / SF we support. Others more shipping ways, please get in touch with us.

Common Countries Logistic Time Reference

RegionCountryLogistic Time(Day)
AmericaUnited States5
Brazil7
EuropeGermany5
United Kingdom4
Ltaly5
OceaniaAustralia6
New Zealand5
AsiaIndia4
Japan4
Middle EastIsrael6

DHL & FedEx Shipment Charges Reference

Shipment charges(KG)Reference DHL(USD$)
0.00kg-1.00kgUSD$30.00 - USD$60.00
1.00kg-2.00kgUSD$40.00 - USD$80.00
2.00kg-3.00kgUSD$50.00 - USD$100

Note:

The above table is for reference only. There may have some data bias for the uncontrollable factors.
Contact us if you have any questions.