{{cartCount}} ShoppingCart Telephone

+86-755-83225825

Email

info@orwintech.com

Skype

orwintech@outlook.com

Wechat
Orwintech Wechat
WhatsApp
Orwintech WhatsApp
Message Top
Product Catalog

SUP50010E-GE3

SUP50010E-GE3

SUP50010E-GE3

lmages are for reference only.
  • Part Number

    SUP50010E-GE3

  • Manufacturer

    Vishay Siliconix
  • Description

    MOSFET N-CH 60V 150A TO220AB

  • Datasheet

    DatasheetDatasheet
  • Package

    TO-220-3

  • In Stock

    13,093 piece(s)

  • Unit Price

    Please Contact Us

  • Lead Time

    Can Ship Immediately

Request for Quotation

  • Payment Methods

  • Delivery Services

N-Channel 60 V 150A (Tc) 375W (Tc) Through Hole TO-220AB

Quick Inquiry

SUP50010E-GE3

Get the Price Now!

Specifications

Category Discrete Semiconductor Products - Transistors - FETs-MOSFETs
Manufacturer Vishay Siliconix
Series TrenchFET®
Packaging Tube
RoHS Status ROHS3 Compliant
FET Type N-Channel
Technology MOSFET (Metal Oxide)
Drain to Source Voltage (Vdss) 60 V
Current - Continuous Drain (Id) @ 25°C 150A (Tc)
Drive Voltage (Max Rds On, Min Rds On) 7.5V, 10V
Rds On (Max) @ Id, Vgs 2mOhm @ 30A, 10V
Vgs(th) (Max) @ Id 4V @ 250µA
Vgs (Max) ±20V
Input Capacitance (Ciss) (Max) @ Vds 10895 pF @ 30 V
FET Feature -
Power Dissipation (Max) 375W (Tc)
Operating Temperature -55°C ~ 175°C (TJ)
Mounting Type Through Hole
Supplier Device Package TO-220AB
Package / Case TO-220-3
Base Product Number SUP50010
Gate Charge (Qg) (Max) @ Vgs 212 nC @ 10 V
Grade -
Qualification -

Parts with Similar Specifications

Product Attribute SUP10250E-GE3 SUP18N15-95-E3 SUP25P10-138-GE3 SUP28N15-52-E3
Part Number SUP10250E-GE3 SUP18N15-95-E3 SUP25P10-138-GE3 SUP28N15-52-E3
Manufacturer Vishay Siliconix Vishay Siliconix Vishay Siliconix Vishay Siliconix
RoHS Status ROHS3 Compliant ROHS3 Compliant ROHS3 Compliant ROHS3 Compliant
Description MOSFET N-CH 250V 63A TO220AB MOSFET N-CH 150V 18A TO220-3 MOSFET N-CH 100V 16.3A TO220AB MOSFET N-CH 150V 28A TO220AB
Series ThunderFET® TrenchFET® TrenchFET® TrenchFET®
Packaging Tube Tube Tube Tube

Shipment

Delivery Time In-stock items can be shipped within 24 hours. Some parts will be arranged for delivery within 1-2 days from the date all items arrive at our warehouse. And Orwintech ships order once a day at about 17:00, except Sunday. Once the goods are shipped, the estimated delivery time depends on the shipping methods and Delivery destination. The table below shows are the logistic time for some common countries.
Delivery Cost Use your express account for shipment if you have one. Use our account for the shipment. Refer to the table below for the approximate charges. (Different time frame / countries / package size has different price.)
Delivery Method Global Common Shipment by DHL / UPS / FedEx / TNT / EMS / SF we support. Others more shipping ways, please get in touch with us.

Common Countries Logistic Time Reference

RegionCountryLogistic Time(Day)
AmericaUnited States5
Brazil7
EuropeGermany5
United Kingdom4
Ltaly5
OceaniaAustralia6
New Zealand5
AsiaIndia4
Japan4
Middle EastIsrael6

DHL & FedEx Shipment Charges Reference

Shipment charges(KG)Reference DHL(USD$)
0.00kg-1.00kgUSD$30.00 - USD$60.00
1.00kg-2.00kgUSD$40.00 - USD$80.00
2.00kg-3.00kgUSD$50.00 - USD$100

Note:

The above table is for reference only. There may have some data bias for the uncontrollable factors.
Contact us if you have any questions.